8/2/14 2:35 AM (MST)
Updated 10 hours 10 minutes ago
25
  Road Construction

Minimal Road Work  I-25 Northbound / Southbound at US 6/6th Avenue (Milemarker 208.5-209) (through September 2014)

10:00 PM-7:00 AM FR and SA FR, Triple lane closure SB I-25 between US 6 and Alameda at 10p with a full closure of SB I-25 at midnight. Lanes open at 7a SA. SA, full closure of SB I-25 at 10p. Lanes reopen at 7a SU. Roadway prep work. Major delays possible. Alternate routes advised. Detours posted.
24 Hours- Ramp from NB I-25 to EB 6th will be closed 24 hours through 2014 for reconstruction. Delays possible. Lanes reduced to 11 ft wide on I-25 through August 2014.